

Why SQ GUIDE is Special?
Featured Products
- Add irrigation function to prevent bone loss and Bone Heating.
- Available exclusively for Dentis SQ Implant.
- Using a metal sleeve, prevents contamination of the surgical site by guide resin, which can be made during drilling.

Accuracy
- With the initial drill (F Ø3.5 STEP Drill), you can drill without slipping because of Side Cutting function.
- Drilling can be done precisely because the lower end of the trailing drill is fixed to the previously drilled place. And at the upper end of the guide hole, the barrel part of the drill is tightly fixed with the sleeve.
Sleeve Contact

Convenience
- By adopting the multi-stage drill, the number of drills can be minimized and the operation can be performed quickly.
- Added convenience : Tissue Punch, Flattener, Profiler Drill, etc.

Initial Dril
- Used to form holes that ensure precise orientation at the initial stage
- Recommended RPM : 800~1,200


Counter Sink
- Used to wide the hole of the Cortical Bone to prevent excessive mounting torque
- Recommended RPM : 800~1,200


STEP Drill
- Used to form diameters and lengths for fixture placement, drilled ahead of drilled space
- Design with multi-layer structure
- Recommended RPM : 800~1,200


Drilling Protocol for Ø5.0×10.0mm Fixture(Offset 9.0mm)

Drilling Protocol for Ø5.0×10.0mm Fixture(Offset 11.0mm)

Drilling Protocol for Ø5.0×10.0mm Fixture(Offset 13.0mm)

Reference: Dentis USA


